Man In The Maze

by Rich Luhr, Editor of Airstream Life magazine

  • About
  • Follow
    • Twitter
  • My books
    • Exploring National Parks
    • Newbies Guide To Airstreaming
    • Airstream trailer maintenance guide
  • “How To Airstream” blog
  • Store
  • Back to Airstream Life
You are here: Home / Archives for Vehicles / Mercedes 300D

Nov 12 2012

The Sort-Out, day 3

We started on Sunday morning at 7:15 a.m. with a sense of optimism, or at least I did.  Despite being the coldest day of the three we had spent working on the old Mercedes 300D, I was feeling good about the project because our list was down to a manageable few remaining tasks.

Pierre, on the other hand, was still feeling some slight trepidation about the O-ring problem from the night before.  Although he had checked carefully to ensure that the substitute O-rings would fit, he wasn’t going to feel right about it until the part was installed.  They were a little tighter than the correct part, which made Pierre’s job hard, but it worked out fine and by 8 a.m. or so the turbocharger drain was back together.  I’ve heard of guys taking an entire weekend to do this one job because it’s not easy under the best of circumstances, so as far as I was concerned Pierre did well under fire.

We kept putting out metal bits on the curb, and inevitably someone with a pickup truck would swing by and grab them.  I put out an old radiator, four shock absorbers, and dead engine mounts, and they disappeared so quickly that I had to be careful about the metal parts we intended to retain.  When I put items I had cleaned on the driveway in a sunny spot to dry, I kept an eye on them.

The hardest jobs had been tackled on Friday and Saturday, so all we had left was fairly minor stuff.  Still, it got messy with dripping fluids, and I was busy keeping up with it all.  I did want the carport to be somewhat better than a toxic waste dump after everything was done.  All the used fluids got collected in big seal-able containers and returned to the auto parts store for proper disposal, and after recycling all of the cardboard, paper, and plastic I was pleased to see that we generated less than a barrel of waste.

By noon it was clear that we were in the home stretch.  The messy transmission service was done, we’d replaced the oil and filter (even though I did it just 200 miles ago; Pierre wanted to give the engine a chance to clean up after some neglect by the prior owner), front shock absorbers, and transmission shift bushings.  So we were able to relax and do some tweaks to the vacuum system, adjust the hood so it closed better, and little stuff like that, before putting the wheels back on and lowering the car down to the ground.

At 1:00 p.m. we were done, and out on a test drive.  Amazingly after all this service, we found only two problems.  There was a loud deep rattle from the right side, which turned out to be a loose caliper.  No big deal although it sounded horrible—just tighten two bolts.  And strangely, the steering wheel was now upside down when the car was going straight.

This second problem confused us a little because Pierre had been scrupulous to follow the factory technique and use the correct factory specialty tools to install the new steering gearbox, but we decided to have a celebratory lunch anyway.  Part of Pierre’s goal this week was to eat well, so every day I took him to a different ethnic restaurant for lunch (Mexican, Indian, Vietnamese) and in the evenings Eleanor cooked up fabulous and enormous dinners.  We worked long days in cold weather but I think we both may have gained weight.

In the end, we worked for only 24.25 hours.  That’s under the budget of 30 hours I had set, which helps with the overall cost. I’m pretty sure the billable time for all this work at a shop would have been at least double.  And it’s nice to wrap up such an intense project with time to spare.  We had time to take the 300D out for a scenic drive around Saguaro National Park, and time afterward to tweak a few things just a little bit more.

Pierre wanted my car to run perfectly, and I can say that he hit the mark.  It still bears the patina of an old car on the outside, but mechanically it’s just about perfect.  I’ve got just a few things to take care of myself, all simple stuff, like a glow plug, a relay, monovalve rebuild, and the rear differential fluid change—things we skipped only because we didn’t have everything we needed for those jobs.

This morning I had to drag myself out of bed at 6:15 for one last task.  We wanted to get the car to the local dealer for an alignment by 7 a.m., so that the odd steering wheel issues could be resolved before Pierre had to head home.   The issue turned out to be simple (the Pitman arm was off by 3 splines, for those of you that know what a Pitman arm is), and the car did need an alignment, and at last we were done.  We collected Pierre’s tools, made one last tiny adjustment to the vacuum modulator, and then he was gone.

This project is still not over, but it’s about 95% done.  When the weather warms back up this week I’ll finish the last seat and when I get the parts I need I’ll do those last few jobs.  Tires are next, and after that we’re ready for a road-trip.  Soon I’ll be looking at the open road through the three-pointed star, while the old-school diesel propels me with the sound of a well-oiled sewing machine.

But that’s not all the satisfaction of this project.  I’ve learned so much.  I can keep it running by myself.  Having taking much of it apart, or at least observed it being taken apart, I have an appreciation for the great engineering that went into the car.  It has fewer mysteries about it now.  Unlike other cars I’ve owned, I feel like I am in control of the man-machine relationship, rather than being a hapless of victim of whatever error message a computerized car might throw up.  I’m not really worried about having a car that will run on scavenged vegetable oil after EMPs destroy all modern cars during a worldwide apocalypse.  I just like having a machine that I understand, and I’m glad I made the effort to get into this project.

 

Written by RichLuhr · Categorized: Mercedes 300D

Nov 11 2012

The Sort-Out, day 2

Before Pierre arrived, he jokingly said that his visit would be “the worst three days of your life.”  (He didn’t know that I’ve been going to Louisville in December for RVIA for eight years.)  He threatened ten hour days, lots of grime, and him barking orders at me all day long.

Ho-hum.  If that’s the worst he threw at me it would be a cakewalk.  And indeed it was on Friday.  I spent much of my time scrubbing decades of grime off old parts in a tub full of black greasy water, I kept the carport organized, hauled trash, handed Pierre tools, and cleaned up spills.  It was kind of like being a dishwasher in a busy restaurant, only things were dirtier.  So this was no big deal.

On Saturday things got a little more challenging.  We are having what is described in Tucson as a “stormy weekend,” meaning that the temperatures plummeted to the 40s overnight, and we had light & scattered rain showers for a few hours in the morning.  Not too bad considering what’s happening in other parts of the country, and it was just enough for me to switch to long pants, a sweatshirt, and a wool cap until things warmed up.  We started promptly at 7 a.m., while the sky was still gray and dim, and plunged right into it—literally.  I can say with certainty, there’s nothing like cleaning brake parts with a toothbrush in cold black water at 8 a.m.

I was chilly, but Pierre was in his element.  Relentlessly cheery, this 6 foot-4 inch dude wedged himself under the car on the bare concrete and happily spent the morning hammering away at reluctant suspension parts.  He replaced the ball joints, the brake rotors, re-packed the wheelbearings, the flexible brake lines, and the often-overlooked “brake sensor harness cables.”  Occasionally he put me on something easy like installing the new brake pads.

Around 9:30 we were joined by Nicholas, a fellow 300D owner who I had met through an online Benz forum. This led to the highlight of the day for us, when Pierre taught us how to adjust the valves on the engine.  Nicholas and I took turns getting the feel of each valve.  I had a really hard time with this, because it’s hard for me to get my head around spatial orientation things sometimes.  Once I could visualize the setup of tappet-nut-nut-spring, it got a lot easier.  We felt good enough about our skills by the end that Nicholas and I vowed to get together later and do the valve adjustment on Nicholas’s 300D without our benevolent teacher to bail us out.

Even though I’ve griped about the weather, we couldn’t have picked a better time to do this job.  A week ago we would have been sweating in 95 degree afternoons.  For this kind of work, it’s nicer to have to wear a cap for a few hours until things warm up, than to be dripping sweat all day.  And of course, being Tucson, it was sunny and pleasant for the rest of the afternoon.

Another bit of good timing: Monday is our local semi-annual “brush & bulky” trash pickup day, when the city comes around to pick up almost anything that won’t fit in a regular trash barrel.  Everyone piles up all their stuff on the curbside, and then in the days before the official pickup, guys in beat-up old pickup trucks cruise the neighborhoods looking for free stuff.  Some of them pick up old furniture for their homes, others collect scrap metal, still other seem to be looking for overlooked treasures to bring to “Antiques Roadshow.”   (Good luck with that.)  So getting rid of a radiator, four rusty brake rotors, and a water pump was easy as pie.  I piled it all on the curb and it was gone a few hours later.  Nicholas took the air conditioning compressor, as it was still working and his doesn’t.

I estimated that in this three-day automotive orgy plus the month of work I’ve done already, we’d be resolving about two years worth of sorting-out tasks. Normally you pace yourself when sorting out a car, because it’s expensive and because it takes a while to figure everything out.  This approach with Pierre is unusual but I think it makes sense for a car that is basically sound, and an owner who wants to be intimately involved in the process.  The downside of doing it all in three days is that one little glitch can really screw up the plan. That’s the thing I’ve been fearing throughout the two days we’ve been working on the car.

We were lucky until about 4 p.m. Saturday.  We’d made a few runs to the local autoparts stores to get minor supplies and tools, which is par for the course.  But then disaster struck.  Pierre had disassembled a difficult part, an oil drain tube that runs down from the turbocharger to the oil pan.  This tube was leaking oil, so I had ordered a special grommet and two rubber O-rings specifically for it.  They were shipped from a Mercedes dealer in California, and each plastic package was labeled exactly as we expected: Seal, turbocharger oil return, 1984 Mercedes 300D.  These silly little rubber circles cost $0.94 each, which is probably ten times what they cost to make, but when you need them you’ll pay whatever it takes (and they know it).

Except when they’re wrong.  After cutting off the old O-rings, we discovered that they’d shipped us the wrong ones.  And as quick as that, we were dead in the water.  Without the proper rings we couldn’t reassemble.  The system would leak oil like an old airplane radial engine.  That meant our other jobs scheduled for Sunday couldn’t be completed either, since they required a running engine.  We were completely screwed.

This is where you find out what your mechanic is made of.  Pierre didn’t disappoint.  First, he committed that if we couldn’t get this engine back together, he would personally harass certain senior management of the company who sold us the part until they paid for the local Mercedes dealer to fix it next week.  Then, he told me that were going O-ring shopping.  And so we spent the next hour or so digging through O-rings at various hardware and autoparts stores in an attempt to find one that was close enough to do the job.

That’s how we ended up working in the dark at 5:45, with the air temperature once again plummeting, when we should have been done for the day and taking hot showers.  We found some O-rings that might work, bought a bunch of them in case we had to double them up, and Pierre meticulously tested them on the drain tube until he was satisfied they would work.  I think he had to do that before he could relax and eat dinner with us in the house, just to know that the job was going to be OK.

Other than that it was a great day.  We did a complete four-wheel brake & bearing job including the parking brakes, adjusted the valves, replaced both engine mounts, an oil change, and replaced the rear shock absorbers.  The list on the wall is getting considerably shorter. Today won’t be completely easy, as we’ve still got some messy and time-consuming tasks on the list, but if it goes well we will have time to put the wheels back on and the seats back in, and take her out for a test drive.  It’s 6:45 a.m. now, and time for me to get ready to meet Pierre in the carport.

Written by RichLuhr · Categorized: Mercedes 300D

Nov 09 2012

The Sort-Out, day 1

This week we’re making a big push toward getting the Mercedes 300D sorted out, and I’m really pumped about it.

For nearly a month I’ve been anticipating the arrival of Pierre Hedary, the young Mercedes guru from Florida who I’ve known for a few years.  Rather than taking the slow road to sorting out the mechanical issues of the old car, Pierre and I have been planning this intense three-day repair session so that the car will be ready to go—anywhere— by Monday.  It’s the crash-diet version of Mercedes repair.

I wouldn’t even attempt this if the car weren’t basically sound.  Although the task list is long, I was driving the car daily before I removed the interior, so I have had a chance to verify that it has “good bones,” meaning that it isn’t just a bottomless money pit.  It just needs a bunch of maintenance.  So for the past three weeks I’ve been identifying what the car needs (sharing photos with Pierre), and buying lots of parts.

I also wouldn’t attempt this if I didn’t have a lot of faith in Pierre.  Flying a mechanic across the country is a big investment.  He has to be extraordinarily competent in his specialty, unflappable, realistic, and fast, to make the investment worthwhile.  Today, after about ten hours of work, it’s clear that he is all of those things.  He’s sort of the Mercedes version of Super Terry, but taller.

We set him up in the Airstream guest house last night, right next to the car.  This morning we both “clocked in” at 7:38 a.m. and began work.  I already had the car set up on jack stands, with all four wheels removed, and most of the interior is still sitting on the back patio, so access to everything is easy.  I also arranged all the parts by car system, brought all my tools, and set up various things we’d need: shop light, tarps, trash barrel, garden hose, wash basin, etc.  The carport is now a functioning shop.

Here’s what Pierre did today (I played go-fer, assistant, and parts cleaner most of the time):

  • air conditioning overhaul with new compressor, drier, expansion valve, hose insulation, and R-134a
  • fixed a climate control actuator inside the dash
  • cooling system overhaul with radiator, water pump, thermostat, one hose, and fluid
  • replaced all four belts

Everything went well, and at the end I had air conditioning that was blowing out at 46 degrees on a 74 degree day, while the engine was idling.  (It should do a little better at speed.)  We did a few more tweaks to squeeze out a little more cooling performance and then wrapped up. It was a full ten hour day, with 90 minutes for lunch and parts shopping. This was an experience that Pierre described as “fun.”  He’s a guy who really likes his work.

Of course, it didn’t all go to plan.  We discovered a few parts that I thought were leaking or faulty really weren’t.  That was good news.  We also found a couple of things that I didn’t catch, like a bad relay, and questionable upper control arms in the suspension.  Fortunately, Pierre is the sort of guy who has suspension parts in his luggage, just in case.  Overall, we’re doing pretty well.

Tomorrow we start by installing new engine mounts, then go on to valve adjustment, then start the four-wheel brake overhaul.  I’m particularly looking forward to those jobs because I want to learn how to do them myself.  I don’t need to; it just seems like an opportunity to learn something new.  The hands-on time with the Mercedes  brakes may serve me well someday when I need to do a disc brake repair on the Airstream.

It’s great to see the car coming back to its original performance.  It’s also fun to have friends dropping in to watch.  Today we were visited by my friend Rob, neighbor Mike, and Eleanor at various points.  Brett called in to see how it was going as well.  I’m expecting another guy to drop in tomorrow.  And most people want to help. It’s a version of Tom Sawyer whitewashing the fence.

If everything goes well, we will wrap up Sunday afternoon, bolt in a couple of seats, and take the car for a celebratory drive up the Catalina Highway.  Stay tuned.

Written by RichLuhr · Categorized: Mercedes 300D

Nov 01 2012

Interior motivation

With the Caravel mostly buttoned back up, I’ve been turning attention to the Mercedes 300D project.  I’m getting deeper in to the car than I had originally planned, but for the most part it has been a gratifying experience and I’ve learned quite a lot.

Guys who fix up old cars generally fall into two camps:  Do-It-Yourself (DIY’ers) and Checkbook Restorers.  It’s a lot like vintage Airstream owners.  I’ve been on both sides of that fence, and they both have their good points.  Checkbook Restoration is kind of like sodding your lawn; it costs more but you have much quicker results.  DIY is like putting down the seed and straw yourself, and watering it carefully for a few months to make sure it grows in perfectly.  Doing it yourself means you need patience and time, but you can indulge your perfectionist tendencies as much as you want.

With a car like this, DIY is the only way to go.  This will never be a highly valued car, so there’s no hope of re-selling it later and making a big profit.   There were too many of them made, so they aren’t rare, and parts to keep them running are easily obtained.  Already I’ve done enough on it in the past few weeks to equal a labor bill of at least a few hundred dollars if I had paid someone else to do the work, by taking on the jobs that are nit-picky and time-consuming and which don’t require much skill.

For example, there were adhesive decals on the front and rear glass.  The front one was relatively easy to remove with some adhesive remover and a razor blade, but the rear decal was covering the thin silkscreened defroster elements.  One slip with the razor blade and I’d have a non-working defroster.  It took about 40 minutes of painstaking work to get that stupid decal off—but it was a satisfying job to do because by going slowly I managed to remove it perfectly, and it was the kind of thing I’d never want to pay someone else to do.

This is also a way to nibble away at the project list while I’m waiting for Pierre to arrive and tackle the major mechanical work.  So I’ve installed a few easy parts (turn signal switch, oil breather tube, some little vacuum levers), degreased the engine bay at the car wash, and removed much of the interior.  Nothing major, just an hour here and there, with one longer session over each weekend.

Right now I’m on an archaeological dig, of sorts.  Pulling out the seats and the carpets revealed a horrifying history of children in the back seat.  There were candy wrappers and arcade tickets, lots of long hair, dried up Coke spills, melted Crayon remnants, coins, pens, plastic balls, a Chinese finger-trap, and various “organic bits” that I preferred not to look too closely at.  Many times you can buy an old Mercedes and find that the back seat has never been used, but in this case it was clearly a family car. I also noted that the family seemed to have an affinity for spilling cola in the car and never cleaning it up. I found at least four separate gluey old spills beneath the carpets, with coins and fragments of plastic toys cemented into them.

You know it’s bad when you feel obliged to don latex gloves to clean up the car interior.  But as my fellow MB-fanatic Charlie noted, “At least there weren’t any used condoms.”  The good part is that it all has cleaned up fairly readily with a Shop-Vac, a bucket of hot soapy water (I use dishwasher detergent to help dissolve the organic material), and a lot of scrubbing with a Scotch-brite sponge.

The big project has been re-coloring the seats.  This car came with “Palomino” colored MB-Tex seats.  MB-Tex is Mercedes’ name for their very durable vinyl, often confused with leather, and Palomino was a coach-leather color.  I say “was” because no Palomino seats have survived the decades.  They always turn a sort of mauve color after 25 years, with pinkish highlights on the tops that are most exposed to UV.  Few people know how they are really supposed to appear, but you can see the difference in the photo below.   The seat on the right is “before” and the seat on the left is “after.”

I found an interesting “elastomeric color coating” (something the average person would call paint) that is designed specifically for vinyl seats, and bought a few cans along with the necessary cleaners and primers.   My project over the last week and into next week is to gradually re-color each seat from their current “Pinkomino” color back to the original Palomino.

It’s not quick or easy, but it is very satisfying.  Each seat has to be carefully cleaned (two or three times with special soap), rinsed and dried, then partially disassembled.  Then all the non-colored parts are masked off with tape and the seat is primed with special vinyl primer.  This is wiped off, then the seat is rinsed and dried again, and finally it’s ready for the color coat.  The color is sprayed on from a rattle-can and takes at least five thin coats before it fully covers.

What a difference!  They look like new when the process is done.  And, like the other jobs I’ve been doing, it’s the kind of thing that I wouldn’t want to pay someone else to do.  For about $140 in materials and perhaps eight hours of time in total, I will have an interior that literally looks like new. This is less time than I put into fixing the Caravel’s water leak, and the results are more visible.  I’ll also be shampooing the carpets in an attempt to make them look more compatible with the “new” seats.

I’m still trying to stick with my program of “something every day, even if it’s small.”  This is my way of avoiding a “gumption block” that might build up and cause me to lose motivation.  One day my only accomplishment was replacing a burned-out bulb in the trunk, but at least I did something, and that actually felt good.

Every day when I have a break from my day job I think about what needs to be done and then I pick something from the list and do it.  Sometimes it’s a matter of breaking a big job into small chunks.  Yesterday my only accomplishment was cleaning and coloring a single headrest.  It doesn’t matter.  It’s nice to do something physical to balance the time I spend doing intellectual work at the computer, and I find that the combination of both makes the day go very quickly.

It’s also motivating to share the project with friends and family.  I know other people who are engaged in their own old car projects, motorcycle projects, boat projects, and I’ve told them about the things I’ve learned.   Eleanor has assisted with several jobs.  I’ve met people online who want to come by and help, or see what I’m doing.  All of those things add gratification and even a tiny bit of peer pressure, both of which keep me moving forward.

But don’t call this a “hobby,” because I don’t plan to do it again.  My goal is to have a car to drive, with the satisfaction of knowing what I did to bring it back to its original greatness.  Once it’s done, it’s roadtrip time!

Written by RichLuhr · Categorized: Mercedes 300D

Oct 15 2012

Project Season

I did say this was “project season,” didn’t I?  Between the house, the Caravel, the Safari, and the 300D the list of jobs seems endless, so I’ve resolved to just tackle one item every single day without fail.  It’s like chipping away at a mountain, but chipping a little at a time is the only way the mountain will disappear.

The 300D project has gotten the most attention.  On Tuesday we replaced the bumper rub strip.  On Wednesday I replaced the rear sway bar links and inspected the rear brakes.  On Thursday Eleanor and I installed a new hood pad.  On Saturday I removed the instrument cluster and fixed the dim lighting, along with the inaccurate temperature gauge.  I used two T-10 LED lights from LED4RV, which really helped to reduce heat in the cluster.  (The plastic was beginning to melt from the hot old bulbs.)  On Sunday I very carefully removed an old decal from the defroster glass, a tricky job without breaking the silkscreened defroster elements.  In between 300D jobs I continued plotting the rest of the car’s resurrection, researching parts and repairs.

On Friday I got brave enough to remove the heaps of flagstone and slate that were pressing down the Caravel’s damaged Marmoleum floor.  It had been baking in the heat for the last week or so.  It appears that the silicone caulk is working well as floor adhesive.  As I feared, the floor is not lying perfectly flat —there’s a small lifted spot— but it’s good enough.

Eleanor came up with the idea of fabricating a trim strip to hold the Marmoleum in place, and so I cut a piece of flat aluminum to size, cleaned it up with a Scotchbrite pad and orange cleaner, drilled three countersunk holes for stainless screws, and then sprayed it with clearcoat.  Beneath the trim I sealed the edges of the Marmoleum with tan silicone caulk.  The dimensions of the aluminum were chosen to match the trim already in the trailer, and I think it looks great.  The three screws are pinning the floor in place.

The next job on the Caravel is to get the new water tank installed.  I got a start on this Saturday, but decided to take a break in favor of other projects.  I think, barring unforeseen problems, that we’ll have this wrapped up in the next couple of days.  The tank is mostly plumbed in, and the rest of it is just reinstalling the furniture, testing for water-tightness, and sanitizing the system.

The Safari hasn’t gotten much love lately. I bought the rest of the flooring material but we really can’t get on that project until the Safari’s little sister gets out of the way.  That should be an interesting one though, as we’ll be removing most of the bedroom, the dinette, and other stuff.

The house always gets the shortest stick.  All it got this week was a repainted exterior light yesterday, and a new dryer vent on the roof this morning.  The many other house projects are just going to have to wait.  For some reason it’s more gratifying to work on the vehicles!

Tomorrow—who knows?  Every day is different.  I just know that something will get done.  One chip at a time …

By the way, the new Alumafiesta site is up …

Written by RichLuhr · Categorized: Home life, Maintenance, Mercedes 300D

  • « Previous Page
  • 1
  • 2
  • 3
  • 4
  • 5
  • Next Page »

Recent Posts

  • Upgrading: Bike rack
  • Upgrading: Bathroom vent
  • “How’s that Ranger tow?”
  • Time to roam differently
  • Say this over my grave

Archives

  • September 2021
  • August 2021
  • July 2021
  • November 2020
  • October 2020
  • May 2020
  • November 2019
  • September 2019
  • July 2019
  • June 2019
  • May 2019
  • October 2018
  • August 2018
  • October 2017
  • September 2017
  • August 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • June 2014
  • May 2014
  • March 2014
  • February 2014
  • January 2014
  • December 2013
  • November 2013
  • October 2013
  • September 2013
  • August 2013
  • July 2013
  • June 2013
  • May 2013
  • April 2013
  • March 2013
  • February 2013
  • January 2013
  • December 2012
  • November 2012
  • October 2012
  • September 2012
  • August 2012
  • July 2012
  • June 2012
  • May 2012
  • April 2012
  • March 2012
  • February 2012
  • January 2012
  • December 2011
  • November 2011
  • October 2011
  • September 2011
  • August 2011
  • July 2011
  • June 2011
  • May 2011
  • April 2011
  • March 2011
  • February 2011
  • January 2011
  • December 2010
  • November 2010
  • October 2010
  • September 2010
  • August 2010
  • July 2010
  • June 2010
  • May 2010
  • April 2010
  • March 2010
  • February 2010
  • January 2010
  • December 2009
  • November 2009
  • October 2009
  • September 2009
  • August 2009
  • July 2009
  • June 2009
  • May 2009
  • April 2009
  • March 2009
  • February 2009
  • January 2009
  • December 2008
  • November 2008
  • October 2008

Categories

  • Airstream
  • Airstream Life magazine
  • Alumafandango
  • Alumafiesta
  • Alumaflamingo
  • Alumapalooza
  • Asia
  • Bicycling
  • Books
  • Caravel
  • Current Events
  • Electrical
  • EUC
  • Europe
  • FAQs
  • Ford Ranger
  • Ford Ranger
  • Globetrotter 23FB
  • Home life
  • Interstate motorhome
  • Maintenance
  • Mercedes
  • Mercedes 300D
  • Mercedes GL320
  • Modernism Week
  • Motorcycling
  • Musings
  • National Parks
  • Photos
  • PTX
  • Recipes
  • Renovation
  • Roadtrips
  • Temporary Bachelor Man
  • Tesla
  • Tucson places
  • Uncategorized
  • Upgrades
  • Vehicles

©2004–2015 Church Street Publishing, Inc. “Airstream” used with permission · Site design by Jennifer Mead Creative